Harrow Weald College Resurfacing Banner

Harrow Weald College

Resurfacing & Sports Court Reconstruction

Scroll
Case study

Project Overview

We were appointed to undertake extensive resurfacing works across multiple areas of Harrow Weald College, including access roads, pedestrian routes and sports facilities.

The existing surfaces had deteriorated significantly, with widespread wear, trip hazards and localised structural failures affecting both safety and usability across the site.

The project required a combination of machine-laid and hand-laid asphalt surfacing together with targeted reconstruction works to rectify underlying structural defects.

Car Park Resurfacing Access

The Challenge

The college required a safe, durable and visually improved surface solution that could be completed within a strict programme window.

Several challenges were identified during the project:

  • Extensive wear and deterioration across multiple surface areas.
  • Existing trip hazards creating safety concerns for site users.
  • Structural failures within sections of the sports court.
  • Areas with restricted access that could not accommodate heavy paving equipment.
  • Tight programme requirements within an operational educational environment.

The sports court presented a particular challenge, with underlying structural defects causing localised failures within the surfacing system.

Road Resurface Side

Our Solution

Smart Surfacing Solutions carried out detailed investigations to identify the extent of the structural issues before implementing permanent repair solutions.

Works included:

  • Planing off existing asphalt surfaces to a depth of 40mm.
  • Reconstruction of failed areas within the sports court.
  • Excavation and replacement of defective construction layers.
  • Installation of new pavement build-up where structural failures were identified.
  • Supply and installation of SMA10 asphalt surfacing.
  • Machine laying of accessible areas.
  • Hand laying of restricted-access sections to achieve a consistent finish throughout the site.

Particular attention was given to maintaining high-quality workmanship within areas inaccessible to large paving equipment, ensuring a seamless finish across the entire project.

Sports Court Reconstruction

The Results

The completed works significantly improved the safety, appearance and long-term durability of the college’s external surfaces.

Key outcomes included:

  • 1,700m² of resurfaced asphalt areas.
  • Removal of existing trip hazards.
  • Permanent repair of structural failures within the sports court.
  • Improved safety for students, staff and visitors.
  • Consistent finish achieved across both machine-laid and hand-laid areas.
  • Completion within the required five-day programme.

The project successfully restored the functionality of key external areas while providing the college with a durable surfacing solution designed for long-term performance.

Access Road Resurface

Client Outcome

Through careful planning, detailed investigation and quality workmanship, Smart Surfacing Solutions delivered a comprehensive resurfacing and reconstruction project that addressed both surface deterioration and underlying structural issues.

The result was a safer, more durable and visually improved environment for students, staff and visitors while ensuring the works were completed within a challenging programme.

Get your free surfacing quote

Let our team of experts handle your surfacing — get a free quote today.