Project Overview

Resurfacing works at Hayes College, London, were executed to address deteriorated asphalt surfaces and uneven levels across key access areas.

The existing surface course had become worn through years of use, with localised uneven areas affecting both appearance and ride quality.

The project required a fast-track solution to restore the surface while working within strict programme deadlines.

Road Resurface Entrance From Rear

The Challenge

The college required a durable resurfacing solution that could be delivered within a short timeframe and with minimal disruption to site operations.

  • Key challenges included:
  • Worn and aged surface course.
  • Uneven surfacing requiring level corrections.
  • Multiple tie-in points to existing infrastructure.
  • Strict programme deadlines.

Careful planning was required to ensure all levels were corrected while maintaining smooth transitions into adjoining surfaces.

Resurfacing On-site

Our Solution

Smart Surfacing Solutions carried out preparatory works to rectify uneven areas before resurfacing the site.

Works included:

  • Planing off defective and uneven asphalt areas.
  • Reprofiling and adjustment of levels where required.
  • Formation of smooth tie-ins to existing surfaces.
  • Supply and installation of 40mm SMA10 asphalt surface course.
  • Final compaction and finishing to achieve a durable and uniform surface.

All works were completed within the required programme.

Access Road Resurface

The Results

The completed works restored the appearance and performance of the college’s external surfacing while eliminating uneven areas and improving ride quality.

Key outcomes included:

  • Improved surface appearance.
  • Corrected levels and smoother transitions.
  • Enhanced durability through the installation of SMA10 surfacing.
  • Reduced future maintenance requirements.
  • Successful completion within a three-day programme.
Entrance Road Resurface Front

Client Outcome

Smart Surfacing Solutions delivered a high-quality resurfacing scheme within a tight programme, providing Hayes College with a durable and visually improved asphalt surface while ensuring the project was completed on time and to specification.